New Arrivals/Restock

1535nm Eye Safe Laser Rangefinder Module, 12000m Long Distance 1535nm Eye Safe Compact Rugged Laser Range Finder Module for Drones

flash sale iconLimited Time Sale
Until the end
20
59
14

$1,560.00 cheaper than the new price!!

Free shipping for purchases over $99 ( Details )
Free cash-on-delivery fees for purchases over $99
Please note that the sales price and tax displayed may differ between online and in-store. Also, the product may be out of stock in-store.
New  $2,600.00
quantity

Product details

Management number 214535396 Release Date 2026/04/12 List Price $1,040.00 Model Number 214535396
Category
  • LASER SPECIFICATIONS: Features 1.54µm wavelength Class 1 eye-safe laser with ≤0.35 mrad divergence angle and 12mm launch lens for precise measurements
  • DETECTION RANGE: Impressive 12km range for large targets, with multi-target tracking capability up to 3 targets simultaneously and 98% precision rate
  • PERFORMANCE FEATURES: Achieves ±2m ranging accuracy with 0.5-10Hz frequency, operating effectively between -40 to +70°C with low power consumption
  • COMPACT DESIGN: Lightweight at 175g with dimensions of 65mm×46mm×86mm, powered by DC12V supply for portable operation
  • INTERFACE & CONNECTIVITY: Equipped with TTL data interface and molex-532610771 electrical interface for seamless system integration
Color Black
Brand Name Generic
Sport Type Drones, Sailing, Shooting
Item Weight 30 Grams
Manufacturer ERDI TECH LTD
Model Number ERDI1535LRF0815C
Material Type Aluminum, Cables, Laser Ranging Finder
Included Components Laser Ranging Module
Warranty Description MTBF ≥ 1500h
Batteries are Included No
Item Dimensions L x W x H 1.3"L x 1.3"W x 1.87"H

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Product Review

You must be logged in to post a review